Projects

Year

2010

Circuit

All

Voltage

500kV

Structure

Danube Self-supporting

Participation in the design of structures for the main transmission lines of the National Interconnected System (SIN)

Map of the Brazilian Power System

Source: Adapted from publication of Eletrobras – Centrais Elétricas Brasileiras S.A. (dec/2017)