Projects

Year

2013

Circuit

Double

Voltage

138kV

Participation in the design of structures for the main transmission lines of the National Interconnected System (SIN)

Map of the Brazilian Power System

Source: Adapted from publication of Eletrobras – Centrais Elétricas Brasileiras S.A. (dec/2017)