Projects

Year

All

Circuit

Double

Voltage

800kV

Structure

Danube Self-supporting

Participation in the design of structures for the main transmission lines of the National Interconnected System (SIN)

Map of the Brazilian Power System

Source: Adapted from publication of Eletrobras – Centrais Elétricas Brasileiras S.A. (dec/2017)