Projects

Year

2012

Circuit

All

Voltage

All

Structure

Pyramidal-Body Self-supporting

Participation in the design of structures for the main transmission lines of the National Interconnected System (SIN)

Map of the Brazilian Power System

Source: Adapted from publication of Eletrobras – Centrais Elétricas Brasileiras S.A. (dec/2017)